Evaluation of distribution grid interconnection and recommendations for upgrades to allow successful interconnection of the Texas State Technical College 2 MW wind turbine to the grid.

Texas Wind Turbine

Outcomes

Lead and reached a resolution on interface discussions with the utility on interconnection issues. Provided engineering solutions to strengthen otherwise a weak distribution grid network at the point of interconnection.