Background
Buffalo Gap 1 consists of 67 Vestas V-80 wind turbines, each rated at 1.8 MW, for a total capacity of 120.6 MW. Buffalo Gap 2 is a 232.5 MW expansion consisting of 155 GE 1.5 MW Wind Turbines. The facility was developed by AES Wind Generation. Buffalo Gap 3 is a 170 MW addition, completed in September 2008, consisting of 74 Siemens 2.3 MW wind turbines.

Approach
- Curtailment
- of Energy Studies
- Grid Interconnection
- and Technical Compliance
- Market
- Operations Reviews
- Design and Analysis
- of Export Capacity
- Validation of Projects
- for Financing With JP Morgan

Outcome
All projects are in operation, and EPE continues to provide technical and operational support to AES Corporation.
Want to learn more about our solutions?
When you partner with EPE, you get an experienced team dedicated to providing you with tailored solutions and expert guidance.
Please fill out the form to the right, and a member of our team will be in touch.