Background

ENGIE North America (ENGIE) is a major player in renewable energy, particularly in wind, solar, and energy storage projects. ENGIE collaborates with various stakeholders to develop innovative energy solutions that reduce environmental impact. For the Anson Solar project, EPE served as ENGIE’s owner’s engineer throughout the design and construction phase, providing expertise to ensure compliance with regulatory standards and facilitating the efficient execution of the project.

Challenge

A key challenge of the project was the detailed review of the photovoltaic (PV) plant design to ensure compliance with all applicable codes and standards. Additionally, the coordination of the MW overhead collection system presented logistical complexities, requiring precise alignment of engineering regulatory requirements, and execution to ensure the system’s efficiency and compliance throughout the project lifecycle.

EPE case study featured image

Approach

EPE planned to work closely with ENGIE and its consultants to review and refine design assumptions, ensuring the project met all compliance requirements.

EPE case study image

Solution

Through this collaboration effort, EPE helped optimize the design for efficiency and reliability, setting the foundation for a successful project implementation.

Download

Want to learn more about our solutions?

When you partner with EPE, you get an experienced team dedicated to providing you with tailored solutions and expert guidance.

Please fill out the form to the right, and a member of our team will be in touch.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.