Identification/Exploration of Industry Asset Performance Analytics Software: Optimizing a Leading Energy Utility Company’s Energy Distribution Framework

Background

EPE was engaged by a leading energy utility company to enhance their operational efficiency and future-proof their energy distribution systems by aligning current technologies with Distribution System Operator (DSO) goals.

Challenge

The client sought to transform its energy distribution network to align with the evolving role of a DSO. With a diverse set of existing systems, including ADMS, GIS, and multiple planning tools, the challenge was to assess these technologies for alignment with DSO requirements, identify critical gaps, and explore emerging technologies to future-proof operations. The client needed a structured approach to streamline its systems, optimize DER management, and ensure compliance with new market regulations like FERC 2222.

EPE case study featured image

Approach

EPE’s comprehensive evaluation would enable the client to gain a clear understanding of their current system landscape and identify critical gaps that needed to be addressed. A strategic roadmap and recommendations provided by EPE would equip the client with actionable insights to optimize their operations, ensuring compliance, improved DER management, and readiness for future market demands.

EPE case study image

Solution

EPE was engaged to conduct a three-phase engagement that included a comprehensive assessment of the client’s current systems, a gap analysis, and the identification of future-leaning applications to drive innovation and efficiency.

Task 1 - Assessment of Current Systems and Tools: EPE provided a Current State Assessment Report highlighting system capabilities, integration points, and alignment with DSO goals.

Task 2 - Identification of Capabilities and Gaps: EPE created a Gap Analysis Report with a detailed comparison of existing functionalities against DSO requirements. EPE offered recommendations for closing identified gaps.

Task 3 - Future-Leaning Applications: EPE provided Future State Recommendations and a phased Implementation Plan that outlined a roadmap for technology enhancements, prioritized based on impact and feasibility.

Download

Want to learn more about our solutions?

When you partner with EPE, you get an experienced team dedicated to providing you with tailored solutions and expert guidance.

Please fill out the form to the right, and a member of our team will be in touch.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.