Background

Located in Atchison County, Missouri, the Rock Creek Wind project consists of 150 Vestas V110 turbines, each rated at 2,000 kW for a total wind project size of 300 MW. The project Point of Interconnection is a new station on the TMO Nebraska City– Mullin Creek– Sibley 345kV transmission circuit. This new station is approximately 58 miles from Nebraska City Substation on the Nebraska City– Mullin Creek line segment and is located in Holt County, Missouri. The performance of the medium voltage gas-insulated switchgear circuit breakers in the Rock Creek Wind project were requested to be evaluated.

Wind Turbine Wind Farm

Approach

EPE evaluated the Transient Recovery Voltage and Rate of Rise of Recovery Voltage and compared it against the GIS TRV/RRRV capability. EPE utilized the PSS E model of the Rock Creek wind project provided by Ulteig to build the PSCAD™/EMTDCTM model for this study.

EPE performed various fault cases to assess the TRV/RRRV of the MV GIS circuit breakers, feeder circuit breakers, as well as switched shunt circuit breakers. A three-phase symmetric fault was applied at the terminal of the MV GIS circuit breaker both for an upstream, grid side and downstream, project side, fault.

substation closeup

Outcome

The MV GIS circuit breakers that were installed at the Rock Creek wind project are not able to withstand the RRRV following a three-phase symmetrical fault on the 34.5 kV bus bar whether the inductive shunts or the capacitive shunts are engaged irrespective of the short circuit level from the grid and irrespective of the grounding grid resistance.

A 350 nF surge capacitance per phase, installed on the medium voltage side of the MPT for MV GIS circuit breakers was found adequate to clear any fault downstream without the risk of a restrike. The feeder breakers were capable of clearing any fault within their protection zone.

 Additionally, a suggestion was made to use the HV circuit breakers to clear medium voltage faults until the surge capacitance is installed. The HV circuit breakers TRV reports were found adequate and made electronically available to EPE, indicating that the HV circuit breakers will be able to clear the faults at the MV (34.5 kV) side without difficulty for any practical grounding grid resistance.

Want to learn more about our solutions?

When you partner with EPE, you get an experienced team dedicated to providing you with tailored solutions and expert guidance.

Please fill out the form to the right, and a member of our team will be in touch.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.